Skip to content
UGC ContractsCreate a contractCreate
Deal terms

How Many Revisions Should a UGC Contract Include?

How many revisions should a UGC contract include? A practical guide for creators and brands on revision rounds, approval windows and what triggers extra fees.

On this page
  1. Why the revision clause decides whether a deal feels fair
  2. How many revision rounds to write in (and when to go higher or lower)
  3. Defining what counts as a revision before anyone edits anything
  4. Approval windows, deemed approval and keeping the clock honest
  5. Pricing extra rounds, reshoots and scope changes
  6. Sample revision clause wording for both sides
  7. Common mistakes
  8. Next steps

Why the revision clause decides whether a deal feels fair

Two rounds is the sensible default for most UGC deals: one round of substantive notes and one round of minor fixes. Drop to one round for low-fee, fast-turnaround volume work. Go to three for paid-ads hero content with several stakeholders. The round count matters less than two things: what counts as a revision, and how long the brand has to ask for one.

If you have run a few collaborations, you already know how this goes wrong. A brand sends notes on Monday, three more on Thursday, then a fourth set after someone in performance marketing finally watches the cut. Nobody agreed that was four rounds. The creator feels like the project never ends. The brand feels like it is being nickel-and-dimed for asking the video to match the brief. Both reactions come from the same gap in the contract.

The revision clause is really a scope clause wearing a different hat. It sets the ceiling on unpaid labour for the creator, and the floor on usable output for the brand. Written well, it also protects the payment schedule, because it stops "we are still reviewing" from becoming an excuse to delay the final invoice. Written badly, or left out entirely, it quietly converts a fixed-fee project into open-ended work.

How many revision rounds to write in (and when to go higher or lower)

Start from the deliverable, not the contract. One round means one consolidated set of written notes, answered once. Here is how the count should move with the job.

One round

Use one round for simple organic UGC produced to a tight brief: a single talking-head video, a product demo, a few photos. The brand approved the concept or script before filming, there is one decision maker, and the fee reflects a fast turnaround. Creators taking volume work should prefer one round plus a clearly priced option to buy more, rather than two rounds baked into a low fee.

Two rounds

Two rounds is the fair middle for most paid UGC packages. Round one catches structure, hook, pacing and claims. Round two catches small fixes: a caption typo, a trim, a different thumbnail frame. This is the count I would write into a standard template unless something about the deal argues otherwise.

Three rounds

Three rounds makes sense when the asset is going into paid media as a hero creative, when legal or regulatory review is involved (supplements, finance, skincare claims), or when the brand genuinely has multiple approvers. If a brand wants three rounds, the creator should price for the calendar time as well as the edit time. Three rounds can stretch a short project across a much longer calendar.

Rounds per deliverable, not per contract

This is the most common sizing error in batch deals. A contract for a batch of videos with "two rounds of revisions" is ambiguous. Does the brand get two rounds on each video, or two rounds across the whole batch? Write it explicitly. The usual fair answer: rounds are per deliverable, but feedback on all deliverables in a batch must be delivered together in one pass so the creator can edit efficiently.

Brands running many creator deals at once get hurt by inconsistency here, because every contract defines rounds differently and nobody can track them. Brands that hire through marketplaces like UGC Roster often standardise these terms in a single template so the review process works the same way on every project.

What each side should ask for

Creators should ask for a hard cap, a written definition of a round, and a stated fee for extra rounds agreed before signing. Brands should ask for two rounds plus a narrow carve-out: fixes needed because the content departs from the approved brief or breaks a disclosure requirement do not consume a round. That carve-out is reasonable, and most creators accept it once it is limited to objective misses rather than taste.

Reduce rounds before they happen

The cheapest revision is the one that never happens. Add a concept or script approval step before filming, with its own short window. Brands get to redirect while redirection is free. Creators get written sign-off that protects them later. A deal with script approval plus one edit round is usually smoother than a deal with two edit rounds and no script stage.

Defining what counts as a revision before anyone edits anything

Write the definition into the contract. A round should mean one consolidated, written set of notes delivered inside the review window, covering all deliverables under review. Notes that arrive after the window, or in a second message after you have already started editing, belong to the next round.

Normally inside a round

  • Trimming, reordering or retiming existing footage
  • Swapping the hook using material already shot
  • Re-recording a voiceover over existing visuals
  • Caption, text overlay, subtitle and spelling changes
  • Music swaps from the agreed library
  • Colour or sound adjustments
  • Adding or correcting the disclosure

Normally outside a round

  • Any new filming, including a single new line to camera
  • A new product, outfit, location, set or talent
  • A new script direction or new creative concept
  • Additional deliverables, cutdowns or aspect ratio variants not listed in the scope
  • Changes required because the brand changed the brief after approval

The brief is the yardstick

Attach the brief as an exhibit and reference it in the revision clause. Then "does this count?" has an answer that does not depend on who is more stubborn. If the brief said handheld in natural light and the creator delivered a tripod shot under a ring light, fixing that is corrective, not a revision round. If the brief said nothing about lighting, the brand is expressing a preference, and preferences consume rounds.

Disclosure fixes sit in their own box

If the brand or creator needs to add or correct a sponsorship disclosure, treat that as a compliance fix outside the round count. Under the FTC's Endorsement Guides (16 CFR Part 255), material connections between an endorser and a brand should be clearly disclosed. Neither side benefits from a clause that makes fixing a disclosure feel like a billable argument.

Checklist to settle before signing

  • How many rounds, per deliverable or per batch?
  • What is one round, in writing?
  • Who is the single approver sending consolidated notes?
  • How long does the brand have to review?
  • How long does the creator have to return the edit?
  • What happens if the window passes with no response?
  • What does an extra round cost, and what does a reshoot cost?

Approval windows, deemed approval and keeping the clock honest

A revision cap is useless without a clock. Without a review deadline, a brand can sit on a delivery for weeks and then open round one, while the creator's final payment and the usage window drift.

Set both sides of the clock

I recommend a short review window in business days for simple organic content, extended where legal review is genuinely involved. Mirror it with a creator turnaround commitment of a similar length. Symmetry makes the clause easy to sell in negotiation. The brand cannot argue for unlimited review time while demanding same-day edits.

Deemed approval

Deemed approval means that if the brand does not send notes inside the window, the deliverable is treated as accepted. It is the single most useful sentence in a revision clause for creators, and it is not unfair to brands, because brands set the window length.

If Brand does not provide written revision notes within the Review Period, the applicable deliverable is deemed approved and accepted, and any further changes requested by Brand will be treated as an Additional Round at the rate set out in Schedule A.

Consolidated feedback

Require notes in one document from one named approver. Drip-fed feedback from several different people is the main reason a capped round count quietly multiplies. Brands benefit too: a consolidated note process forces internal alignment before the creator starts re-editing.

Feedback must be delivered in a single written document from Brand's named approver. Notes received separately after the first submission of notes for the same deliverable will be treated as a new Round.

Keep payment off the approval hook

Tie final payment to delivery plus expiry of the review period, or to deemed approval, not to subjective satisfaction. "Payment due upon Brand's approval" hands one party control of the other party's cash flow. If you are also negotiating payment timing, settle the invoice trigger and the payment window in the same clause, so neither depends on a subjective sign-off.

A worked scenario

Say a creator delivers a small batch of videos on a Friday with a review window measured in business days. The brand sends notes on the first video a few days later and nothing else. Under a well-drafted clause, the remaining videos are deemed approved when the window closes, and the creator invoices for them. The brand still gets its round on the first video. Nobody has to send a passive-aggressive follow-up to find out where things stand.

Pricing extra rounds, reshoots and scope changes

Price extra work in the contract, before anyone is annoyed. A fee agreed at signing is a line item. The same fee quoted mid-project feels like a hostage negotiation.

Three tiers, not one

Separate the price list into additional edit rounds, reshoots, and scope changes. They cost wildly different amounts of work and should never share a rate.

An additional edit round is editing time against existing footage. A reshoot means setting up again: product, outfit, location, lighting, talent, filming and a fresh edit. A reshoot fee should sit much closer to the original production fee than to an edit fee, because it is close to producing the asset twice. A scope change (new deliverable, new platform cut, new concept) is not a revision at all. It is a new order, and it should be documented in a short written amendment with its own fee and its own delivery date.

The levers that set the price

Rather than reaching for a benchmark, price from the drivers: how much setup is involved, whether props or product need reordering, whether other people (a second person on camera, a pet, a child) have to be rescheduled, whether rush turnaround is required, and whether the change was caused by the brand changing its mind after approving the brief. Creators who keep a written price list for these items negotiate faster. A UGC rate card template is a practical place to park those line items so they travel with every quote.

What brands should push for

Brands should ask that corrective work at the creator's fault stays free, and that extra round pricing is fixed at signing rather than quoted later. Brands should also resist buying extra rounds as a substitute for a clear brief. Paying for an extra round every time is more expensive than putting a little more effort into a sharper reference deck.

When the brand walks away mid-revision

If a brand abandons a project after filming or after round one, the revision clause should connect to a kill fee so the creator is paid for work completed. The mechanics, and what each side should accept, are in how to structure a kill fee in a UGC contract.

Sample revision clause wording for both sides

Adapt these, do not paste them blind. For high-value, unusual or long-term deals, have a lawyer review the final document.

A balanced clause

Revisions. Brand is entitled to the number of Rounds of revisions per deliverable set out in Schedule A. A "Round" means one consolidated set of written notes submitted by Brand's named approver within the Review Period. Revisions are limited to edits of material already captured, including trims, re-ordering, hook changes, voiceover re-records, captions and music swaps. Any request requiring new filming, new product, a new location, a new concept or an additional deliverable is not a revision and will be quoted separately as Additional Work. Brand must submit notes within the Review Period stated in Schedule A. Creator will return the revised deliverable within the Turnaround Period stated in Schedule A. If Brand does not submit notes within the Review Period, the deliverable is deemed approved. Additional Rounds are available at the rate set out in Schedule A.

A creator-leaning variant

Add a cap on total calendar time and make the fee trigger automatic.

All revision activity for a deliverable must be completed within the Revision Window stated in Schedule A, measured from first delivery. After that date the deliverable is deemed approved and the final invoice becomes due. Additional Rounds are invoiced at the rate in Schedule A and are payable before the revised file is delivered.

A brand-leaning variant

Add a narrow corrective carve-out tied to the approved brief.

Edits required because a deliverable materially departs from the approved Brief, omits a required disclosure, or contains an inaccurate product claim will be made by Creator at no cost and do not count as a Round.

Negotiation scripts

Creator asking to cap unlimited revisions: "Happy to build in revisions. I work to two rounds per video so the timeline holds. I will also fix anything that misses the brief at no charge. If you need a third round, it is on my rate card and you can add it any time."

Brand asking for a third round: "Our paid team reviews after the brand team, so we need three rounds on the hero asset. Can we price that in now rather than renegotiate mid-flight? We will commit to consolidated notes from one approver."

Creator pushing back on a reshoot framed as a revision: "That change needs new filming, so it sits outside revisions. I can do it as a reshoot. Here is the fee and the new delivery date. Alternatively, we can get close using the footage we have, within the round you have left."

Common mistakes

Writing "revisions until the brand is satisfied"

This happens because it sounds generous and closes the deal quickly. It makes the creator's workload depend on someone else's mood, and it gives the brand an excuse to withhold final payment. Replace subjective satisfaction with an objective standard: the deliverable conforms to the approved brief and the stated specs.

Capping rounds without defining a round

Two rounds sounds precise until notes arrive in a scatter of separate messages. The fix is one sentence: a round is one consolidated set of written notes from one named approver, inside the review window. Everything after that is a new round.

Leaving out a review deadline

Brands get busy and deliveries sit unread. The creator cannot invoice, cannot close the project, and cannot plan. Add a review period and deemed approval. Brands should accept this, since they control how long the window is.

Ambiguous rounds in batch deals

A multi-video contract with "two rounds" invites a fight about whether that means two per video or two in total. State per deliverable, and require batch feedback in one pass. This protects the creator's editing time and the brand's launch date.

Treating reshoots as revisions

Brands often assume a quick extra clip is a small ask, because the creator is "already set up". They are not, and product, lighting and wardrobe rarely still exist as they did. Define filming as outside the round count, and price a reshoot separately.

Tying final payment to approval

This is the clause that causes the most bad blood. Approval is subjective and open-ended. Tie payment to delivery plus expiry of the review period, or to deemed approval. Brands keep their quality protection through the corrective carve-out, not through withheld money.

Skipping script or concept approval, then buying rounds to fix it

Brands sometimes think a pre-production step slows things down. It usually saves a full round, because redirecting a concept before filming costs nothing. Creators should offer it. Brands should ask for it and commit to a short turnaround on it.

Forgetting that revisions interact with the rest of the contract

Revision delays push back live dates, which eats into usage windows and exclusivity periods. State that the usage term starts on the first live date or on approval, whichever the parties intend, so a slow review does not silently shorten the brand's licence or extend the creator's lockout. Other clauses worth sanity-checking are listed in UGC contract clauses you should never skip.

Next steps

Do this in order. First, decide your default: two rounds per deliverable, consolidated written notes, a short review window in business days, and deemed approval if the window passes. That default is defensible from both sides of the table, and you only need to argue about the exceptions.

Second, write the definition of a round and the list of what sits outside it. This single paragraph prevents more disputes than the round count itself. Attach the brief as an exhibit so there is an objective reference for what a "miss" is.

Third, set your prices for additional rounds, reshoots and scope changes now, while nobody is under pressure. Creators: put them on your rate card and send them with every quote. Brands: ask for them at signing so a mid-project change is an invoice line, not a renegotiation.

Fourth, connect the revision clause to payment and to the usage term. Final payment should turn on delivery and the expiry of the review period. The usage window should have a defined start date that a slow approval cannot distort.

When the terms are settled, put them in writing before any filming starts. You can build the deliverables, review windows, revision cap, extra-round fees and usage terms into one agreement and send it for e-signature in the UGC contract builder. UGC Contracts provides templates and tools, not legal advice, and is not a law firm. For a high-value, long-term or unusual deal, get a lawyer in your jurisdiction to review it before you sign.

FAQ

Questions, answered.

How many revisions is standard in a UGC contract?

Use one round for fast, low-fee organic work produced to a pre-approved script. Use three for paid hero creative or regulated categories where legal reviews claims. Say you commission a single talking-head demo and the script was signed off before filming. One round is usually enough, because the big decisions were made upfront. Creators, write the count per deliverable and price extra rounds separately. Brands, ask for the count you genuinely need, since every extra round costs you calendar time too.

What counts as a revision vs a new brief in a UGC deal?

A revision refines content you already approved in concept. A new brief changes the inputs: the concept, script direction, location, wardrobe, product, talent or aspect ratio. Imagine you approved a kitchen demo, the creator films it, and then marketing asks for the same script shot outdoors with a different product variant. That is a reshoot, not a revision, and it should carry a reshoot fee. Creators, list in the contract what triggers new-brief pricing so you are not arguing about it mid-project. Brands, consolidate internal opinions before the shoot, because direction changes after filming are the most expensive kind.

What is deemed approval and why does it protect both sides?

Deemed approval means a deliverable is treated as accepted if the brand does not send consolidated written notes inside the agreed review window. It protects creators from silent files that block the final invoice. It protects brands too, because it forces a clean internal process instead of scattered feedback arriving for weeks. Say you deliver a cut and hear nothing until a stakeholder returns from leave. With a deemed approval clause, the project closed and payment is due. Both sides can set this when they build the agreement in the [UGC Contracts builder](https://ugccontracts.com/create), which covers revisions and approvals alongside payment terms.

How long should the brand's approval window be?

Short, written in business days, and sized to who actually reviews the work. As a recommendation, keep the window tight for simple organic content with one decision maker. Extend it where legal or regulatory review is involved, and say so in the clause rather than negotiating it later. Imagine a supplements brand that needs claims checked before sign-off. A longer window is reasonable there, but it should be fixed, not open. Creators, tie the window to deemed approval so silence ends the round. Brands, name one feedback owner who consolidates notes before the window closes.

Who pays for a reshoot when the brief changes?

The brand pays, assuming the creator delivered against the approved brief. A reshoot means new filming time, setup, wardrobe and often a new product sample, so it sits outside revision rounds. Say you approved a script, the creator shot it faithfully, and then your team decided a different hook would perform better. That is a change of mind, not a defect. Creators, agree a reshoot fee in the contract so the price is settled before anyone is annoyed. Brands, keep the exception narrow: if the creator ignored the brief, missed agreed talking points or delivered unusable footage, the reshoot should be on them.

What is the difference between script approval and final cut approval?

Script approval locks the concept and the words before filming. Final cut approval signs off the edited deliverable. Treating them as separate gates is the cheapest way to avoid reshoots, because changes are almost free on paper and expensive on camera. Imagine a brand that skips script sign-off, then objects to the opening claim after the video is cut. Now you are paying for a reshoot that a quick read of the script would have prevented. Brands, require written script approval and name the approver. Creators, insist on it, and state that content matching the approved script counts as on-brief for revision purposes.

How should creators price extra revision rounds?

Price them as a flat per-round fee stated in the contract, not as an awkward conversation after the included rounds run out. Include the calendar cost, not just edit time, because extra rounds push your next booking back. Say a brand wants another pass after the included rounds are used. Your clause should let you reply with a price you already agreed, invoice it and proceed. Brands, do not read this as a penalty, because a priced option is cheaper than a creator padding the base fee for rounds you may never need. Free [contract templates](https://ugccontracts.com/templates) are a useful starting point for wording this clause.

What happens if the brand never approves the content?

If your contract has deemed approval, nothing stalls: the deliverable is accepted when the window closes and payment becomes due. Without that clause, payment can drift indefinitely while you chase a reply. Say you deliver on time and the brand simply goes quiet after a reorganisation. Your protection is a payment schedule tied to delivery and the review window, not to subjective sign-off. Creators, add a kill fee for cancellation after filming, and withhold usage rights until you are paid in full. Brands, remember that unapproved does not mean unlicensed and unpaid. You still owe for work delivered to brief.

Keep reading
All guidesCreate your UGC contract